Practical example: a ball screw and guide rails on a lathe
PRAXIS BEISPIEL |
PRACTICAL EXAMPLE |
KUGELUMLAUFSPINDEL UND FÜHRUNGSSCHIENEN AN EINER DREHMASCHINE |
BALL SCREW AND GUIDE RAILS ON A LATHE |
Ball screw and guide rail replacement is now a thing of the past!
The problem
The facts
Arbeitsaufwand |
Work required |
Maschine reinigen |
Cleaning the machine |
Ausbau der Spindel |
Removing the ball screws |
Einbau der Spindel |
Installing the ball screws |
Spindel justieren |
Adjusting the ball screws |
PRO JAHR MUSSTEN 4 SPINDELN UND 16 FÜHRUNGSWAGEN AUSGETAUSCHT WERDEN |
4 BALL SCREWS AND 16 GUIDE CARRIERS NEEDED TO BE REPLACED EVERY YEAR |
Repair costs |
12 hours |
Wage costs |
2 workers at 80 € / hr |
Ball screw costs |
1200 € |
Storage costs |
2 pcs 300 € |
Guide carriers |
4 pcs 1000 € |
Adjusting the ball screws |
8 hours |
Loss of production |
1000 € per hour |
The innotech solution
For several years now, the running surfaces of the ball screws and the guide rails have been repetadly sprayed with innotech 100 High Performance Maintenance Oil (HLW 100) over a specific period of time.